Exhibition stand design for trade shows in Poland, with a 3D visual
We draw your stand to the floor plan and technical rules of your hall in Poland: layout, walls, graphics, space for the counter and storage. You approve a 3D visual, and we print and build from the finished files.
Model and plan before printWhat the job covers
- stand layout on the organiser's floor plan: row, corner or island
- 3D visual for your approval
- graphic design for walls, counter and hanging banner
- dimensioned drawing for the build crew
- list of items to print and items to hire
- submission of the stand design to the organiser
What we do not do
- we do not design the stand electrical installation
- we do not design logos or brand identity systems
- we do not do structural calculations for double-deck stands
What this service does not cover.
How it runs
- 01Briefstand plan, hall number, brand assets
- 02Layoutvolume and placement on the plan
- 033D visualfor your approval
- 04Filesprint-ready graphics, drawing for the crew
Where we work
We design remotely, on the organiser's floor plan, to the rules of the halls listed below, all of them in Poland. Other shows in Poland on request.
Turnkey stand
From floor plan to staff: one order.
- 01DesignLayout on the organiser's floor plan and a 3D visual.
- 02PrintFabric walls, roller banners and flags from our own machines.Trade shows and events
- 03Stand buildInstallation in the build-up window, strike after closing.Exhibition stand build
- 04Fit-outFurniture, lighting, carpet, screen, power from the hall.Stand fit-out
- 05StaffHostesses and an interpreter for the show days.Hostesses and interpreters
The questions that come up most
FAQWhat do you need to start the design?
The stand plan from the organiser with dimensions and the hall number, your brand assets (logo as outlines, colours) and a list of what has to fit: counter, storage, meeting table, screen.
How long does the design take?
We send the first visual within 5 working days of receiving complete materials. The price includes 2 rounds of revisions. Order the design before print: production lead time counts from file approval.
Can I order the design alone, without print and stand build?
Yes. You receive the visual, print-ready files and a dimensioned drawing that any crew can build the stand from.
Does the design follow the hall regulations?
Yes. We take the build height, distances to neighbours and rigging points from the technical regulations of the show before we draw the volume. We submit the stand design to the organiser on your behalf.
Tell us what we are printing. And the opening date, if there is one.
We answer within 24 hours on working days. If the deadline is tight, call: that is faster than a form.
