In the hall, inside the build-up window

Exhibition stand build in Poland for exhibitors from abroad

We put up the stand from material we print ourselves: wall, platform, hanging rig and stage graphics. We arrive inside the build-up window and strike after closing.

Two crew members stretching a fabric graphic onto a display wall frame in an exhibition hall, a platform and truss beside them.Build-up window

What the job covers

  • textile walls on aluminium frames, keder tensioned in the channel
  • platforms and set building
  • hanging rigs and truss
  • large format graphics for the stage and the stand walls
  • strike after the show closes

What we do not do

  • we do not design the stand electrical installation
  • we do not register the stand build with the organiser on your behalf
  • we do not rent out furniture or AV equipment

What this service does not cover.

How it runs

  1. 01Orderartwork, stand plan, hall number
  2. 02Productionprint and finishing within the product lead time
  3. 03Transportdelivery to the stand number
  4. 04Build-up windowinstallation before opening
  5. 05After closingstrike and removal

Material this applies to

  • Fabric walls

    The backdrop of the stand. An aluminium frame with tensioned fabric. Two people assemble it without tools and it goes back into its case for the next show.

    Lead time: 5-7 days
  • Roll-ups

    An advertising surface one person puts up without tools. One minute to unroll, fits in a boot, survives several seasons.

    Lead time: 3 days
  • Flags and feather flags

    What people see from the aisle and the car park before they reach the stand. Feather flags outside the hall, flags on masts, on water bases or cross feet.

    Lead time: 4 days

Where we work

We travel to the halls listed below, all of them in Poland. Other shows in Poland on request; we do not build outside Poland.

The questions that come up most

FAQ
Do you install a stand from material you did not print?

Yes, as long as the system is a standard one and we get a dimensioned plan. For a non-standard structure we ask for photos of the profiles before we take the job.

What if something gets damaged during build-up?

A reprint delivered to the stand within 24 hours. It is the same route we use for transport damage.

Is the fabric fire-certified for the hall inspection?

Yes, the wall fabrics carry the DIN 4102 B1 fire certificate and a paper copy travels in the parcel. Without it, the hall inspectors will not approve the stand.

All services
Quotation

Tell us what we are printing. And the opening date, if there is one.

We answer within 24 hours on working days. If the deadline is tight, call: that is faster than a form.

Format, quantity, substrate, deadline. The more specific, the faster the quote.